Division 06

Finish Carpentry & Cabinets

Architectural millwork, base and casing trim, and kitchen and bath cabinet installation — coordinated with your countertop fabrication and plumbing rough-in schedule. We sequence our cabinet work against your drywall and paint timeline so your superintendent does not have to.

Kitchen cabinets

Base and upper cabinet installation, level and plumb, to manufacturer and project spec. All finishes verified against unit type matrix before mobilization.

Bath cabinets & vanities

Vanity cabinet installation coordinated with mirror and plumbing fixture delivery. Single-trade coordination for bath packages.

Architectural millwork

Base, casing, crown, and door casing installed to project drawings. Tolerances checked against flooring substrate before trim installation begins.

Closet shelving systems

Wire and laminate closet systems installed to unit plans. Coordinated with Division 10 wire shelving scope where applicable.

Door hardware

Lever sets, deadbolts, hinges, and door stops installed and keyed. Keying schedules submitted to superintendent prior to installation.

Schedule coordination

Cabinet delivery confirmed against drywall and paint completion. Countertop measure sequenced immediately after cabinet set to avoid remeasure delays.

Request a Division 06 bid
Division 08

Mirrors & Shower Doors

Frameless and semi-frameless shower enclosures and vanity mirrors for residential units and common-area applications. Supplied and installed under one scope, coordinated with your tile and plumbing fixture schedule.

Frameless shower enclosures

Tempered glass panels and hardware in standard and custom configurations. Measured after tile install for exact fit.

Semi-frameless shower doors

Aluminum-framed door systems in a range of finishes. Selected to coordinate with plumbing fixture and hardware finish specifications.

Tub enclosures

Bypass sliding door systems for tub-shower combinations. Installed after tile and surround completion.

Vanity mirrors

Cut-to-size and framed vanity mirrors for residential units and common bathrooms. Supplied to unit type schedule and installed with cabinet package.

Common area mirrors

Lobby, fitness, and amenity space mirrors specified to design intent and installed to wall blocking.

Shower niche accessories

Glass or tile-ready niche shelves coordinated with tile subcontractor. Scope clarified at pre-construction.

Request a Division 08 bid
Division 09

Flooring

LVP, carpet, tile, and specialty flooring specified to your finish schedule and installed to manufacturer tolerances and project drawings. We perform substrate inspection before any material goes down and document pre-existing conditions.

Luxury vinyl plank (LVP)

Floating and glue-down LVP installation for residential units and commercial spaces. Flatness tolerance verified to ASTM F710 before installation begins.

Ceramic & porcelain tile

Wet area and common area tile installation to industry tile council specifications. Layout and grout joint width confirmed with superintendent before start.

Carpet

Broadloom and carpet tile installation for residential units, corridors, and amenity spaces. Seam placement submitted before cutting.

Transition strips & thresholds

Material transitions between flooring types and at unit entry doors. Specified against floor height differentials at pre-construction.

Substrate prep

Subfloor grinding, patching, and self-leveling underlayment where required. Documented before material installation. Not assumed in base bid unless specified.

Specialty flooring

Rubber, cork, and sheet vinyl for fitness, utility, and specialty spaces. Specification reviewed at pre-construction for compatibility with substrate.

Request a Division 09 bid
Division 10

Specialties

The full Division 10 package — toilet accessories, partitions, signage, mailboxes, fire protection specialties, and wire shelving. Supply and installation under one subcontract, with delivery coordinated against your interior finish milestone dates.

Toilet accessories

TP holders, towel bars, grab bars, soap dispensers, and robe hooks per unit type matrix and ADA requirements. Blocking confirmed with GC before drywall.

Toilet partitions

Powder-coated steel, solid plastic, and phenolic partitions for commercial restrooms. Ceiling-hung, floor-mounted, or floor-to-ceiling configurations per drawings.

Signage

ADA-compliant room identification, directional, and informational signage. Permit-set specifications followed. Mounting heights confirmed against architectural drawings.

4C mailboxes

USPS-approved 4C horizontal mailbox systems for multi-family projects. Rough opening coordinates provided to GC at pre-construction.

Fire protection specialties

Fire extinguisher cabinets and Knox boxes supplied and installed. Cabinet type and recess depth confirmed against wall construction.

Wire shelving

Ventilated wire shelving for pantry, linen, and utility closets per unit plans. Wall anchor type confirmed to wall construction before installation.

Request a Division 10 bid
Division 11

Window Treatments

Miniblinds and manual and motorized roller shades for residential units and commercial spaces. Measured, supplied, and installed under one scope. Cordless and motorized options available to meet child safety codes and smart building requirements.

Miniblinds

Aluminum and faux-wood slat blinds for residential units. Cut to opening width on site. Cordless lift standard; wand tilt where specified.

Roller shades — manual

Solar and blackout fabric roller shades for units and commercial spaces. Fascia and cassette options to match interior finish specification.

Roller shades — motorized

Battery-operated and hardwired motorized shades for amenity spaces, lobbies, and premium unit types. Compatible with major smart building control systems.

Measurement & scheduling

Window openings measured after drywall and paint are complete. Installation scheduled as a late-stage finish item to minimize damage on active sites.

Request a Division 11 bid
Division 12

Countertops & Solid Surface

Laminate, quartz, granite, and solid surface countertops fabricated and installed to your unit type matrix. We sequence measure against cabinet installation and coordinate delivery with your plumbing sub to prevent schedule breaks.

Quartz countertops

Engineered stone countertops templated after cabinet installation, fabricated, and installed with undermount sink cutouts. Edge profiles per unit type spec.

Granite & natural stone

Slab selection available through our supplier relationships. Seam placement and edge profile submitted for approval before fabrication begins.

Laminate countertops

High-pressure laminate in a full range of colors and patterns. Economical option for value-grade units with fast fabrication timelines.

Solid surface

Corian and similar seamless solid surface for bath vanities and wet wall applications. Integral sink options available for high-use commercial applications.

Measure sequencing

Template performed immediately after cabinet set is complete. Fabrication timeline communicated to superintendent at the time of measure.

Plumbing coordination

Countertop delivery and installation coordinated with plumbing sub trim-out schedule. Sink cutout dimensions confirmed against fixture submittals before fabrication.

Request a Division 12 bid
Division 22

Plumbing Fixture Supply

Sinks, shower pans, surrounds, and fixture trim kits supplied to the job site on your schedule. Final connections coordinated with your licensed plumbing sub. We handle procurement, delivery, and site storage.

Kitchen & bath sinks

Undermount and drop-in sinks supplied to match countertop and cabinet specification. Delivered to floor-level for plumbing sub trim-out.

Shower pans

Acrylic and composite shower bases in standard and custom dimensions. Delivered ahead of tile or surround installation.

Shower surrounds

Acrylic and composite wall surround systems for tub and shower applications where tile is not specified. Installed after shower pan is set and approved.

Fixture trim kits

Faucets, shower valves, and accessory trim kits supplied to match finish specification across all unit types.

Procurement & logistics

We manage purchase orders, delivery scheduling, and on-site storage. Your plumbing sub receives what it needs, when it needs it.

Final connection coordination

Fixture delivery sequenced against your plumbing sub's trim-out schedule. We communicate directly with the plumbing sub to prevent conflicts at inspection.

Request a Division 22 bid

Ready to bid your next project?

Send us the specs. We will come back with a complete interior finishes package across every division you need.